New Releases in this Updates


Update ID Type Title Functional Area
PE-477 New Feature

Progress Billing - New Function "Suggest Billing by Billing Category"

Progress Billing

PE-631 New Feature

New Enhancement for Project Price List Feature

ProjectPro Basics

PE-642 Enhancement

PFW - Conditions for Sub-Level Projects with Master Project Forecast

Project Forecast

PE-666 New Feature

Unit Cost Production by Task Report – Include Sub-Levels

Reports

PE-668 Enhancement

Archived Project Quote – Budget Totals on Task Total Subpage

Project Quote

PE-686 Enhancement

ProjectPro Caption Change from Job to Project Update - New Page & Report

ProjectPro Basics

PE-692 New Feature

Advanced Payroll – Prevailing Wage Rates and Benefit

Advanced Payroll

PE-694 New Feature

Work Units and Work UOM on Crew Time Sheet

ProjectPro Basics

PE-702 Enhancement

Project Ledger for PO with Multiple Tasks and Type G/L

Account Payables

PE-703 Enhancement

Improvements to the Crew Time Sheet

ProjectPro Basics

PE-704 Enhancement

Rev Rec "Billings to Date" Calculations

Revenue Recognition

Note: Details are given below in “Release Note Details”.


Release Note Details

PE-477

New Feature – Progress Billing - New Function "Suggest Billing by Billing Category"

A new feature has been created to link Budget lines to Billable lines falling under multiple project task and under same task.

  • A new Projects Setup under Progress Billings fast tab is created as “Suggest Billing by Progress Billing Links”.
  • 3 new fields have been added to the “Payroll Interface Journal” page:
    • If enabled, then a new field “Progress Billing Link” will be mandatory on project planning lines and every transaction for that project.
    • The default value set here will flow to the Project card as well.

  • Release july  v1 image

    Release july  v1 image

  • A new “Progress Billing Links” page has been created to define the different billing links to be used company wide.

  • Release july  v1 image

  • The value defined on the project planning lines will flow to every document. This can be defined on any line type, budget, Billable or Both Budget and Billable.

  • Release july  v1 image

    Release july  v1 image

    Release july  v1 image

  • Based on Actual Cost and Planning lines having the same “Progress Billing Link”, the calculation of POC is done, see below example.

  • Release july  v1 image

  • This is achieved by a new function as “Suggest Billing by Progress Billing Links” which will calculate the POC% and update the “Quantity” on the billing lines having the same billing links.

  • Release july  v1 image

PE-631

New Feature – New Feature for Project Sales Price List

  • A new feature, “Contract Sales Prices”, has been added to the Project Sales Price List. This allows you to refer to the existing Sales Prices for the Customer and Customer Price Groups that are related to the project.

  • Release july  v1 image

    Release july  v1 image

    Release july  v1 image

    Release july  v1 image

    Release july  v1 image

    Release july  v1 image

PE-642

Enhancement – PFW - Conditions for Sub-Level Projects with Master Project Forecast

Below are the enhanced conditions for a Master Project with “Forecast to Include Sub-Levels” as True:

  • Project Sub-Levels with “Status = Planning” will be excluded from the Master Project Forecast.
  • Project Sub-Levels with “Exclude from Project Forecast” will be excluded from the Master Project Forecast.

PE-666

New Feature – Unit Cost Production by Task Report - Include Sub-Levels

The Unit Cost Project by Task report now has an option to include the sub-levels of the master project. Additionally, you can also round off the report values to the nearest decimal place.

Release july  v1 image

PE-668

Enhancement – Archived Project Quote - Budget Totals on Task Total Subpage

The Budget (Total Cost) and Budget (Total Price) columns in the Task Total subpage of an Archived Project Quote were incorrectly summing values from the current planning lines instead of using the archived planning lines tied to that specific revision.

This caused all revisions to display the same budget totals, resulting in inaccurate reporting and undermining the purpose of revision tracking.

The logic has now been updated to ensure the values reflect only the archived planning lines relevant to the selected revision.

Release july  v1 image

PE-686

Enhancement – ProjectPro Caption Change from Job to Project Update - New Page & Report

The following pages and reports have been updated to reflect the caption change from 'Job' to 'Project'.

Release july  v1 image

PE-692

New Feature – Advanced Payroll – Prevailing Wage Rates and Benefits

On the “Project Sales Price List”, two new fields have been added: “Fringe Benefit” and “Wages”.

Release july  v1 image

A new field has been added on the Employee card as “Resource Group”.

Release july  v1 image

Define the Wages, Fringe Benefits, and Resource Group code on the employee card.

The Wages and Fringe Benefits should also be defined on the Sales Project Price Lists. Enable the “Requires Certified Payroll” on the project card.

A new Boolean has been added on the request page of the “Create Payroll Interface Entries” as “Calculate Wages in lieu of Benefits”. Enable this if you want to calculate wages and benefits w.r.t the Davis-Bacon Act.

Release july  v1 image

The wages are then calculated on the Payroll Interface Journal under the Rate column. A new column, “Fringe Benefits”, has been added to the Payroll Interface Journal, which is updated from the benefits assigned on the Project Sales Price List.

Release july  v1 image

Note: When using the Prevailing Wage Rate feature, the existing payroll function is disabled. You cannot use both for the same project.

PE-694

New Feature – Work Units and Work UOM on Crew Time Sheet

The “Work Units” and “Work UOM” fields have been added to the Crew Time Sheet Lines as two new fields. You can now post work units directly through the Crew Time Sheet.

Release july  v1 image

PE-702

Enhancement – Project Ledger for PO with Multiple Tasks and Type G/L

The system creates Project Ledger entries for the PO created either individually or through subcontracting when multiple tasks have been taken.

PE-703

Enhancement – Improvements to the Crew Time Sheet

  • The Skill Class Code on the crew time sheet lines is now verified with the existing list of codes in the system. You are not allowed to enter anything manually that doesn’t exist.

  • Release july  v1 image

  • You are allowed to register time through the crew time sheet for the projects with the Status as “Completed”.

  • Release july  v1 image

PE-704

Enhancement – Rev Rec "Billings to Date" Calculations

The “Billings to Date” column on the Revenue Recognition Summary Details page now matches the POC report when created via posting the project forecast worksheet.