  • Product Update 19.0.18.30666 for Microsoft Dynamics 365 Business Central

Content


New Releases in this Update

Update ID Type Title Functional Area
PRJ-1276 Improvement

In Job Resource setup error messages resolved.

ProjectPro Basic

PRJ-1285 Task

Progress Billing No. field value should not be copied from the master job

ProjectPro Basic

PRJ-1286 Task

New Default task message when no option selected on the existing default task message

ProjectPro Basic

PRJ-1291 Task

Cost & Billing Report Detailed should have a job no. defaulted when running from the job card

ProjectPro Basic

PRJ-1293 Improvement

Open in Excel Button Required in Committed Line List Page

ProjectPro Basic

PRJ-1301 Improvement

Creation of separate Fast tab for Crew Timesheet on Human Resource Setup & add a specific caption for ProjectPro Fast tab.

Crew Timesheet

PRJ-1325 Task

Required two new events in ProjectPro solution

ProjectPro Basic


Release Note Details

PRJ-1276

In Job Resource setup error messages resolved.

Improvement – Earlier in Job Resource Setup, the Validation Update was coming once the user was creating a new Line before any information is entered, the same has been fixed now.

PRJ-1285

Progress Billing No. field value should not be copied from the master job.

Task – If the Master job has the Progress Billing No. updated and from that Master Job.

PRJ-1285

PRJ-1286

 New Default task message when no option selected on the existing default task message.

Task – Now,  when creating a “change order”, the system now gives 2 options: -

  • “Do You want to Use Default Tasks of Type Default”- Yes or No → If “No” is selected then the below message comes?
  • “Do you wish to use Master Job Tasks”? – “Yes or No” → If “yes” is selected, then the system copies the same tasks as in the “Master Job”.
PRJ-1286

PRJ-1291

“Cost & Billing Report Detailed” should have a Job No. defaulted when running from the job card.

Task – If we run the “Cost & billing report  Detailed” from any “Job card” then the “Job No”. comes by default in the filter now.

PRJ-1291

PRJ-1293

Open in Excel Button Required in Committed Line List Page.

Improvement – Improvement has been done , now under the “share” option, the “Send to Excel” function exports the Committed Line List to an excel file.

PRJ-1293

PRJ-1301

Creation of separate Fast tab for Crew Timesheet on Human Resource Setup & add a specific caption for ProjectPro Fast tab.

Improvement – As per the improvement done, a separate Fast Tab for “Crew Time Sheet” on “ Human resource Setup page” has now been created.

PRJ-1301

PRJ-1325

Required two new events in ProjectPro solution

Task – Two new events in the ProjectPro Solution has been added, these are,

OnAfterInsertPurchaseHeader(PurchaseHeader).

OnAfterInsertPurchaseLineFromJobMaterialPlanning(PurchaseLine, JobMattPlan).


Update ID Type Title Functional Area
PRJ-1224 Hot Fix

Amendment in Functionality of Update Job Planning Line Function on Job Material Planning

Job Planning Line

PRJ-1226 Hot Fix

Assembly BOM components refresh issue resolved

Job Planning Line

PRJ-1281 Hot Fix

Boolean Field provided on “HR Setup” by the name “Activate Skill Class Code”.

Crew Timesheet

PRJ-1295 Hot Fix

Post to Labor functionality not working

ProjectPro Basic

PRJ-1306 Hot Fix

Message appearing while creating PO for resource via JMP.

ProjectPro Basic


Release Note Details

PRJ-1224

Amendment in Functionality of Update Job Planning Line Function on Job Material Planning.

Hot-Fix – As per the Hot-Fix, if there is any Amendment in Job Planning Line or Assembly BOM Component Lines, then while using “Update Planning Lines” Button system will only fetch changes on “JMP”.


PRJ-1226

Assembly BOM components refresh issue resolved.

Hot-Fix – As per the Hot-Fix, below mentioned pointers has been fixed.

  • System is now refreshing the “Job Planning Lines” from updated “Assembly BOM Component”
  • Whenever user changes the “Assembly BOM Main Item” on “Job Planning Lines”, the “Assembly BOM” Components are now getting updated.
  • “Main Item No”., “Level” and “Item Type” are now getting updated in case of changing the “Assembly BOM” on “Job Planning Lines”.

PRJ-1281

Boolean Field provided on “HR Setup” by the name “Activate Skill Class Code”..

Hot-Fix – This has been fixed now, skill class if not defined in the Crew timesheet must be filled in the manager timesheet lines. This condition will only work if, in the HR setup, the Boolean is true.

PRJ-1281

PRJ-1295

 Post to Labor functionality not working.

Hot-Fix - The “Post to Labor” function was not working when the “Job Journal” is posted while fulfilling the criteria of the “Job setup”, now this has been fixed.


PRJ-1306

Message appearing while creating Purchase Order for Resource via Job Material Planning.

Hot-Fix – There was a message coming while creating  “Purchase Order” in  “Job Material Planning” which has been resolved now.