All-In-One Construction Accounting Software

  • Home
  • >
  • Product Update 18.0.2.24945 for Microsoft Dynamics 365 Business Central

Content

Overview

This update replaces previously released updates. You should always install the latest update.

Updates are intended for new and existing customers who are running ProjectPro with Microsoft Dynamics 365 Business Central.


Important

We recommend that you contact your ProjectPro Partner before you install update. It is important to verify that your environment is compatible with the updates that will be installed. A update may cause interoperability resolved with customizations and third-party products that work together with your ProjectPro solution.


New Releases in this Update

Update ID Type Title Functional Area
PRJ-563 Enhancement

Assembly BOM Functionality added in Job Order and in Job Quote along with Job Material Planning

ProjectPro Basic, Job Material Planning, Job Quote

PRJ-604 Enhancement

Validation or Message Pops-up when someone try to enter New Task No. to the Sub-Job or Change Order which is not there is Master Job

Job Planning Lines

PRJ-634 Enhancement

Job Material Planning Worksheet is pulling in non-purchasable Resources

Job Material Planning

PRJ-704 Feature Change

Caption to be Change on Job Setup - Use Job Take-off Segment from Get Job Segment

Job Material Planning

PRJ-731 Feature Change

Replacement of Hyperlink on "Learn More" feature available on Tool Tip on ProjectPro fields

Progress Billing
PRJ-751 Feature Change

Change the names associated with the Manager Job Status on Job Card (88)

ProjectPro Basic

PRJ-754 Feature Change

Changes in the Variance Report

ProjectPro Basic
PRJ-756 Feature Change

Shifting of "Auto Lock Planning Line" field from Job Quoting Fast Tab to General Fast Tab on Job Setup

ProjectPro Basic
PRJ-759 Feature Change

Shifting of Currency Related fields to Foreign Fast Trade Tab

ProjectPro Basic


Release Note Details

PRJ-563

Enhancement - Assembly BOM Functionality added in Job Order and in Job Quote along with Job Material Planning

New functionality of having Assembly BOM is added in Job Card, which enable the capability of having Assemblies and Sub - Assemblies to the Job Planning Lines which will further place all the subcomponents to the Job Material Planning


Release july image 1 Release july image 2

PRJ-604

Enhancement - Validation or Message Pops-up when someone tries to enter New Task No. to the Sub-Job or Change Order which is not there in Master Job

1. While attaching a Sub Job to Master, system will not do anything but if someone try add a new task to the Sub Job then system would POP a Message “The Task No. ---- doesn’t Exist in the Master Job No. ---- . Do you want to Continue? “

2. Same thing happened if user create a Change Order and then user tried to a New Task no. to the Change Order

Release july image 3

PRJ-634

Enhancement - JMP Worksheet is pulling in non-purchasable Resources

If the “Resource is Purchasable” check is marked as TRUE on the Resources Card, then it will not pick up the Job Material Planning worksheet.

This happened in all the below mentioned cases on where Job Planning Line are to fetched on Job Material Planning Worksheet.

  • Copy Job Planning Lines
  • Get Actual Job Material
  • Update Job Planning Lines

PRJ-704

Feature Change - Caption to be Change on Job Setup - Use Job Take-off Segment from Get Job Segment

Caption is changed from “Get Job Segment” to “Use Job Take-Off Segment” on Job Setup

Release july image 4

PRJ-731

Feature Change – Replacement of Hyperlink on "Learn More" feature available on Tool Tip on ProjectPro fields

Changed the Website or Portal displays while clicking on the Learn more option on the ProjectPro fields

Portal / Website - Construction Accounting Software - ProjectPro (projectpro365.com)

Release july image 5

Release july image 6

PRJ-751

Feature Change – Change the names associated with the Manager Job Status on Job Card (88)

Option changes on field “Manager Job Status”

  • Manager Job Status → Job Card (88)
  • Reporting Status → Subcontract (14021300)
Release july image 7

Release july image 8

PRJ-754

Feature Change – Changes in the Variance Report.

Some new changes made in the Variance Report related to formatting.

Release july image 9

PRJ-756

Feature Change – Shifting of "Auto Lock Planning Lines" field from Job Quoting Fast Tab to General Fast Tab on Job Setup

Shifting of "Auto Lock Planning Lines" field from Job Quoting Fast Tab to General Fast Tab on Job Setup has been done.

Release july image 10

PRJ-759

Feature Change – Shifting of Currency Related fields to Foreign Trade Fast Tab on Job Card

All the Foreign Currency related fields are now available on the Foreign Trade Fast Tab on Job Card

Release july image 11
Update ID Type Title Functional Area
PRJ-713 Hot Fix

Balance vs. Balance Due on Customer Card

ProjectPro Basic

PRJ-753 Hot Fix

Currency Factor wrong calculation

Progress Billing
PRJ-761 Hot Fix

Default Job Planning Lines (Editable) - Hide/Unhide Fields

ProjectPro Basic

PRJ-762 Hot Fix

APO Links made Editable in Ribbon of Job Card

ProjectPro Basic

PRJ-774 Hot Fix

When trying to create a New Revision for a Job Quote, System updated

ProjectPro Basic



Release Note Details

PRJ-713

Hotfix - Balance vs. Balance Due on Customer Card

Balance ($) is showing the total of Amount ($) for all Open Entries

Balance Due ($) is also showing the total of Amount ($) for all Open Entries but filter out the entries based on Date Filter you applied

Release july image 12

PRJ-753

Hot Fix - Currency Factor wrong calculation

This is being fixed

PRJ-761

Hotfix –Some changes in the Default Job Planning Lines (Editable)

If Dimensions on Job Card are not defined on the General Ledger Setup as a Shortcut Dimensions, then

  • Line Job Description
  • Unit Of Measure Code
  • Gen. Busi. Posting Group
  • Gen. Prod. Posting Group
Release july image 13

PRJ-762

Hotfix - APO Links made Editable in Ribbon of Job Card

Enabling of APO Links on Job Card.

Release july image 14

PRJ-774

Hotfix -When trying to create a New Revision for a Job Quote, System updated

This is being fixed

Let us Add Value to Your Construction Business

Suggest New Feature

Understanding Construction Forecasting with ProjectPro

Download eBook
Download eBook