PRJ-1276 | Improvement |
In Job Resource setup error messages resolved. |
ProjectPro Basic |
PRJ-1285 | Task |
Progress Billing No. field value should not be copied from the master job |
ProjectPro Basic |
PRJ-1286 | Task |
New Default task message when no option selected on the existing default task message |
ProjectPro Basic |
PRJ-1291 | Task |
Cost & Billing Report Detailed should have a job no. defaulted when running from the job card |
ProjectPro Basic |
PRJ-1293 | Improvement |
Open in Excel Button Required in Committed Line List Page |
ProjectPro Basic |
PRJ-1301 | Improvement |
Creation of separate Fast tab for Crew Timesheet on Human Resource Setup & add a specific caption for ProjectPro Fast tab. |
Crew Timesheet |
PRJ-1325 | Task |
Required two new events in ProjectPro solution |
ProjectPro Basic |
Release Note Details
PRJ-1276
In Job Resource setup error messages resolved.
Improvement – Earlier in Job Resource Setup, the Validation Update was coming once the user was creating a new Line before any information is entered, the same has been fixed now.
PRJ-1285
Progress Billing No. field value should not be copied from the master job.
Task – If the Master job has the Progress Billing No. updated and from that Master Job.

PRJ-1286
New Default task message when no option selected on the existing default task message.
Task – Now, when creating a “change order”, the system now gives 2 options: -
- “Do You want to Use Default Tasks of Type Default”- Yes or No → If “No” is selected then the below message comes?
- “Do you wish to use Master Job Tasks”? – “Yes or No” → If “yes” is selected, then the system copies the same tasks as in the “Master Job”.

PRJ-1291
“Cost & Billing Report Detailed” should have a Job No. defaulted when running from the job card.
Task – If we run the “Cost & billing report Detailed” from any “Job card” then the “Job No”. comes by default in the filter now.

PRJ-1293
Open in Excel Button Required in Committed Line List Page.
Improvement – Improvement has been done , now under the “share” option, the “Send to Excel” function exports the Committed Line List to an excel file.

PRJ-1301
Creation of separate Fast tab for Crew Timesheet on Human Resource Setup & add a specific caption for ProjectPro Fast tab.
Improvement – As per the improvement done, a separate Fast Tab for “Crew Time Sheet” on “ Human resource Setup page” has now been created.

PRJ-1325
Required two new events in ProjectPro solution
Task – Two new events in the ProjectPro Solution has been added, these are,
OnAfterInsertPurchaseHeader(PurchaseHeader).
OnAfterInsertPurchaseLineFromJobMaterialPlanning(PurchaseLine, JobMattPlan).