{"id":954,"date":"2023-08-31T10:18:09","date_gmt":"2023-08-31T10:18:09","guid":{"rendered":"https:\/\/www.projectpro365.com\/user-guide\/?p=954"},"modified":"2025-04-14T08:04:50","modified_gmt":"2025-04-14T08:04:50","slug":"interim-jle-purchases","status":"publish","type":"post","link":"https:\/\/www.projectpro365.com\/user-guide\/advanced\/projectpro-basic-2\/interim-jle-purchases\/","title":{"rendered":"Ch 18 &#8211; Interim JLE Purchases"},"content":{"rendered":"<p><b>Contents<\/b><\/p>\n<table class=\"table table-striped\" width=\"612\">\n<tbody>\n<tr>\n<td><a href=\"#intro\">INTRODUCTION<\/a><\/td>\n<\/tr>\n<tr><\/tr>\n<tr>\n<td><a href=\"#1\">PURCHASES &#038; PAYABLE SETUP<\/a><\/td>\n<\/tr>\n<tr>\n<td><a href=\"#2\">PROCESS<\/a><\/td>\n<\/tr>\n<tr>\n<td><a href=\"#3\">1. Purchase Order<\/a><\/td>\n<\/tr>\n<tr>\n<td><a href=\"#4\">2. Purchase Invoice via Get Receipt Lines<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><b id= \"intro\">INTRODUCTION<\/b><\/p>\n<p>A construction company wishes to capture the cost of material with every receipt and load it on project as usage. This is done for big projects which have high inventory &#038; Project Manager wishes to capture project expense with every material receipt. This function is optional &#038; is kept at company level. The functionality is used to capture interim cost for material receipt only &#038; is not applicable for services (G\/L) &#038; resources.<\/p>\n<p><b id=\"1\"><a name=\"_Toc14413989\"><\/a>PURCHASES &#038; PAYABLE SETUP<\/b><\/p>\n<p>On the Purchases &#038; Payables Setup, turn on the \u201cEnable Rcpt. Interim Entries in JLE\u201d from the General fast tab. This feature is optional &#038; if made true, system will start creating \u201cInterim Entry\u201d in &#8220;Project Ledger Entry&#8221; with each Purchase Receipt posted against an Item. <\/p>\n<p><em><u><b>Note:<\/b><\/u> This setup of \u201cInterim Entries\u201d is only applicable for Item &#038; shall not work for \u201cResource\u201d or \u201cG\/L\u201d.<\/em><\/p>\n<p><img decoding=\"async\" src=\"\/user-guide\/wp-content\/themes\/userguide\/images\/ch-18-interim-jle-purchases1.png\" alt=\"null\" \/><\/p>\n<p><b id=\"2\">PROCESS<\/b><\/p>\n<p><b id=\"3\">1. Purchase Order<\/b><\/p>\n<p>Create a Purchase Order for a project using the normal process as you use, update the quantities to be received and post the order with Receive option.<\/p>\n<p><img decoding=\"async\" src=\"\/user-guide\/wp-content\/themes\/userguide\/images\/ch-18-interim-jle-purchases2.png\" alt=\"null\" \/><\/p>\n<p>Navigate through the posted receipts by clicking on Order &#8594; Receipts &#8594; Find Entries<\/p>\n<p><img decoding=\"async\" src=\"\/user-guide\/wp-content\/themes\/userguide\/images\/ch-18-interim-jle-purchases3.png\" alt=\"null\" \/><\/p>\n<p><img decoding=\"async\" src=\"\/user-guide\/wp-content\/themes\/userguide\/images\/ch-18-interim-jle-purchases4.png\" alt=\"null\" \/><\/p>\n<p>Project Ledger entries shall be created for the number of lines with Item.<\/p>\n<p><img decoding=\"async\" src=\"\/user-guide\/wp-content\/themes\/userguide\/images\/ch-18-interim-jle-purchases5.png\" alt=\"null\" \/><\/p>\n<p>When we drill Down these Project Ledger entries then entries can be reviewed with the \u201cInterim Entry\u201d check mark as \u201cTrue\u201d and the \u201cAccrual Status\u201d as \u201cOpen\u201d.<\/p>\n<p><img decoding=\"async\" src=\"\/user-guide\/wp-content\/themes\/userguide\/images\/ch-18-interim-jle-purchases6.png\" alt=\"null\" \/><\/p>\n<p><b id=\"4\">2. Purchase Invoice via Get Receipt Lines<\/b><\/p>\n<p>Create a Purchase Invoice with the same details as that of the Purchase Order\u2019s header. Update the Lines using Get Receipt Lines function. <\/p>\n<p>Here, both options are being used as posting the first line with full receipt quantity and second as the partial receipt quantity.<\/p>\n<p>For full receipt quantity, the system will behave as standard with reversal of interim line marking line status equal to close.<\/p>\n<p>One the lines are updated, post the invoice by clicking on Posting &#8594; Post.<\/p>\n<p><img decoding=\"async\" src=\"\/user-guide\/wp-content\/themes\/userguide\/images\/ch-18-interim-jle-purchases7.png\" alt=\"null\" \/><\/p>\n<p>Once the Invoice gets Posted go back to the Posted Purchase Receipt and navigate that to see that Project Ledger Entries are now available with 5 entries where each Interim entry is reversed with complete quantity replacing with standard Project Ledger Entry created upon posting the invoice. The last interim entry for partial quantity is created with status Open, which will be used for upcoming Purchase Invoice against same PO.<\/p>\n<p><img decoding=\"async\" src=\"\/user-guide\/wp-content\/themes\/userguide\/images\/ch-18-interim-jle-purchases8.png\" alt=\"null\" \/><\/p>\n<p>On drilling down the Project Ledger Entries, we find that the status of the knocked off entries is changed to Closed and one Open Interim Entry is created as we invoiced the receipt partially in one case.<\/p>\n<p><img decoding=\"async\" src=\"\/user-guide\/wp-content\/themes\/userguide\/images\/ch-18-interim-jle-purchases9.png\" alt=\"null\" \/><\/p>\n<p>On comparing the Quantity, you can see that 4 entries have been entirely knocked off and one additional Interim Entry of remaining quantity had been created with Quantity 10.<\/p>\n<p><img decoding=\"async\" src=\"\/user-guide\/wp-content\/themes\/userguide\/images\/ch-18-interim-jle-purchases10.png\" alt=\"null\" \/><\/p>\n<p><i>Please note that the Undo Receipt functionality will run the same as before with additional Interim Project Ledger Entries for both positive and negative quantities.<\/i><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contents INTRODUCTION PURCHASES &#038; PAYABLE SETUP PROCESS 1. Purchase Order 2. Purchase Invoice via Get Receipt Lines INTRODUCTION A construction company wishes to capture the cost of material with every receipt and load it on project as usage. This is done for big projects which have high inventory &#038; Project Manager wishes to capture project &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.projectpro365.com\/user-guide\/advanced\/projectpro-basic-2\/interim-jle-purchases\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Ch 18 &#8211; Interim JLE Purchases&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23,38],"tags":[],"class_list":["post-954","post","type-post","status-publish","format-standard","hentry","category-projectpro-basic-2","category-projectpro-basic-3","entry"],"_links":{"self":[{"href":"https:\/\/www.projectpro365.com\/user-guide\/wp-json\/wp\/v2\/posts\/954","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectpro365.com\/user-guide\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.projectpro365.com\/user-guide\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.projectpro365.com\/user-guide\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.projectpro365.com\/user-guide\/wp-json\/wp\/v2\/comments?post=954"}],"version-history":[{"count":9,"href":"https:\/\/www.projectpro365.com\/user-guide\/wp-json\/wp\/v2\/posts\/954\/revisions"}],"predecessor-version":[{"id":1475,"href":"https:\/\/www.projectpro365.com\/user-guide\/wp-json\/wp\/v2\/posts\/954\/revisions\/1475"}],"wp:attachment":[{"href":"https:\/\/www.projectpro365.com\/user-guide\/wp-json\/wp\/v2\/media?parent=954"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectpro365.com\/user-guide\/wp-json\/wp\/v2\/categories?post=954"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectpro365.com\/user-guide\/wp-json\/wp\/v2\/tags?post=954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}