New Releases in this Update

Update ID Type Title Functional Area
PRJ-1308 Enhancement

Job Dimensions overriding line dimensions.

ProjectPro Basic

PRJ-1335 Enhancement

Job Revenue Category required on Item Master

ProjectPro Basic

PRJ-1344 Enhancement

The flow of description from the Job card to the Purchase order

ProjectPro Basic


Release Note Details

PRJ-1308

Enhancement - Job Dimensions overriding line dimensions.

Job Dimensions were overriding the line dimensions on the Purchase and Sales document, which has been fixed now.

PRJ-1335

Enhancement - Job Revenue Category required on Item Master.

If the user wants to change the “Revenue Category” on the “Planning Lines”, there is now the provision to change the category on line levels.


PRJ-1344

Enhancement - Flow of description from the Job card to the Purchase order.

When “Add Job Address” Boolean is enabled on the purchase order then the description from the Job card was not flowing to the “Purchase order Name” field, this has been fixed now.


Update ID Type Title Functional Area
PRJ-1312 Hot Fix

The contract price is not updated on the Job Quote document even after deleting the segment lines. The user has to re-open the page for the value to be refreshed.

Job Quote

PRJ-1316 Hot Fix

JMP "Purchase Resources" Not working

Job Material Planning

PRJ-1336 Hot Fix

Unit Cost not Updating for Get Linked Resource Lines

ProjectPro Basic

PRJ-1345 Hot Fix

Segment Code Change on Job Planning Lines

ProjectPro Basic


Release Note Details

PRJ-1312

Hot Fix - The contract price is not updated on the Job Quote document even after deleting the segment lines. The user has to re-open the page for the value to be refreshed.

When we were deleting any of the “Segment Line” from the “Segments” then the “Total Contract Price” was not updating even after the page refresh, but now changes have been made and the “Total Contract Price” is updating when we delete any of the “Segment” Line from the different “segments” on the “Job Quote” Page.

PRJ-1316

Hot Fix – JMP "Purchase Resources" Not working.

  • When using the “Purchase Resources” option in “Job Material Planning” it was not working.
  • Instead of creating a “Purchase Order”, a “Purchase Invoice” was being generated.
  • The “Purchase Invoice” That was generated has random other items mixed into it.
  • “Use Purchase Orders for Resource” option on “Job Setup” is now working.

above mentioned Pointers have been resolved now.

PRJ-1336

Hot Fix - Unit Cost not Updating for Get Linked Resource Lines.

when using the “Get Linked Resource” feature on the “Job Quote”, a new “Resource” line was created for the “Linked Resource”, The “Unit Cost” of this “Linked Resource” was not populating on “Planning Lines” which has been fixed now.


PRJ-1345

Hot Fix - Segment Code Change on Job Planning Lines.

There was a missing condition in the code, that the Forecast Method on the job card is set to “Forecast by Segment Code” only then the user was not allowed to change the “Segment code” on the “Job Planning Lines”, this has been added to the options in “Forecast Method” on the “Job card”.