PRJ-493 Enhancement

Job Received Not Invoiced Report: Details to Show the date “As of Date”

Job Planning Lines

PRJ-563 Enhancement

Assembly BOM in Job Order

Job Material Planning

PRJ-604 Enhancement

Discuss and clarification to why a Job Task Must Exist in the Master in order to be used by Change Order?

Job Planning Lines

PRJ-634 Enhancement

JMP Worksheet is pulling in non-purchasable Resources

Job Material Planning

PRJ-704 Feature Change

Caption to be Change on Job Setup - Use Job Take-off Segment from Get Job Segment

Job Material Planning

PRJ-731 Feature Change

Replacement of Hyperlink on "Learn More" feature available on ProjectPro fields

Progress Billing

PRJ-751 Feature Change

Change the names associated with the Manager Job Status on Job Card (88)

ProjectPro Basic
PRJ-754 Feature Change

Changes in the Variance Report

Report and Analysis
PRJ-756 Feature Change

Shifting of "Auto Lock Planning Line" field from Job Quoting Fast Tab to General Fast Tab on Job Setup

ProjectPro Basic

PRJ-759 Feature Change

Shifting of Currency Related fields to Foreign Fast Trade Tab

ProjectPro Basic



Release Note Details

PRJ-563

Enhancement - Assembly BOM in Job Order

New functionality of having Assembly BOM is added in Job Card, which enable the capability of having Assemblies and Sub - Assemblies to the Job Planning Lines which will further placed all the subcomponents to the Job Material Planning


PRJ-604

Enhancement –Validation or Message Pops-up when someone try to enter New Task No. to the Sub-Job or Change Order which is not there is Master Job

1. While attaching a Sub Job to Master, system will not do anything but if someone try add a new task to the Sub Job then system would POP a Message "The Task No. ---- doesn’t Exist in the Master Job No. ---- . Do you want to Continue?"

2. Same thing happened if user create a Change Order and then user tried to a New Task no. to the Change Order

PRJ-634

Enhancement -JMP Worksheet is pulling in non-purchasable Resources

If the "Resource is Purchasable" check is marked as TRUE on the Resources Card, then it will not picked up the JMP worksheet.

This happened in all the below mentioned cases on where Job Planning Line are to fetched on Job Material Planning Worksheet.

  • Copy Job Planning Lines
  • Get Actual Job Material
  • Update Job Planning Lines

PRJ-704

Feature Change - Caption to be Change on Job Setup - Use Job Take-off Segment from Get Job Segment

Caption is changed from "Get Job Segment" to "Use Job Take-Off Segment" on Job Setup

PRJ-731

Feature Change – Replacement of Hyperlink on "Learn More" feature available on ProjectPro fields

Changed the Website or Portal displays while clicking on the Learn more option on the ProjectPro fields

Portal / Website - Construction Accounting Software - ProjectPro (projectpro365.com)




PRJ-751

Feature Change – Change the names associated with the Manager Job Status on Job Card (88)

Option changes on field “Manager Job Status”

  • Manager Job Status -> Job Card (88)
  • Reporting Status -> Subcontract (14021300)



PRJ-754

Feature Change –Changes in the Variance Report

Some new changes made in the Variance Report related to formatting

PRJ-756

Feature Change – Shifting of "Auto Lock Planning Lines" field from Job Quoting Fast Tab to General Fast Tab on Job Setup

PRJ-759

Feature Change – Shifting of Currency Related fields to Foreign Trade Fast Tab on Job Card

All the Foreign Currency related fields is now available on the Foreign Trade Fast Tab on Job Card

Update ID Type Title Functional Area
PRJ-713 Hot Fix

Balance vs. Balance Due on Customer Card

Report and Analysis
PRJ-753 Hot Fix

Fixing of hotfix in Currency Factor

Progress Billing
PRJ-761 Hot Fix

Default Job Planning Lines (Editable) - Hide/Unhide Fields

Job Planning Lines

PRJ-762 Hot Fix

APO Links made Editable in Ribbon of Job Card

ProjectPro Basic

PRJ-774 Hot Fix

When trying to create a New Revision for a Job Quote, System shows an Error

ProjectPro Basic



Release Note Details

PRJ-713

Hotfix -Balance vs. Balance Due on Customer Card

Balance ($) is showing the total of Amount ($) for all Open Entries

Balance Due ($) is also showing the total of Amount ($) for all Open Entries but filter out the entries based on Date Filter you applied

PRJ-753

Hot Fix - Currency Factor wrong calculation

This is being fixed

PRJ-761

Hotfix –Some changes in the Default Job Planning Lines (Editable)

If Dimensions on Job Card are not defined on the General Ledger Setup as a Shortcut Dimensions, then

  • Line Job Description
  • Unit Of Measure Code
  • Gen. Busi. Posting Group
  • Gen. Prod. Posting Group

PRJ-762

Hotfix - APO Links made Editable in Ribbon of Job Card

Enabling of APO Links on Job Card

PRJ-774

Hotfix -When trying to create a New Revision for a Job Quote, System shows an Error

This is being fixed